Decision

Michael plans to build post scheduling directly into Megaphone Studio in September 2026, then migrate off Typefully entirely once it ships.

Context

Michael flagged this in Megaphone on 2026-08-13, telling Blake Stewart, Blake Emal, and Ben to set a reminder to audit Typefully usage before end of the month, ahead of the build. The move is driven by a desire to consolidate tooling inside Studio and reduce external dependencies.

Options considered

Keep using Typefully (current state). Rejected in favor of an in-house solution that fits inside the Studio product the team already operates.

Consequences

  • Engineering (Rafael) will need to scope and build post scheduling for Studio in September.
  • The team should catalog exactly which clients/workflows use Typefully before migration.
  • Once shipped, Typefully can be cancelled (cost savings; tool consolidation).
  • Likely affects Megaphone ghostwriting workflow end-to-end.